Descargar Imprimir esta página

kqueo K-LIFT SBASE Instrucciones De Montaje página 33

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

STEP N°5 : FIXING THE STRUCTURE TO THE TRAY
TOOLS NEEDED
5.1 Once this is done, screw the other 4 screws © and gaskets (F) into the in-
serts located at the ends of the structure's supports.
5.2 Place the structure on the tray, use 2 screws (C) and the 2 joints (F) to fix
the middle of the crossbar in the 2 pre-drilled holes in the middle of the tray.
12

Publicidad

loading