Owner's Manual
·
The recovery machine is working properly and any potential ignition sources are
sealed.
·
There's not potential for mixing refrigerants in cylinders or recovery units.
·
Compressors or compressor oils are properly evacuated if they are to be
removed, and evacuating the compressor prior to returning the compressor to
the suppliers if it is evacuated.
·
Oil is drained out safely if it is to be drained out.
Decommissioning Process
·
Pump down the refrigerant system if possible (otherwise making a manifold so
that refrigerant can be removed from various parts), making sure that the
cylinder is on the scales before recovering refrigerant.
·
Operate the recovery machine in accordance with instructions, not filling
cylinders to more than 80% liquid volume charge, not exceeding the max
working pressure of the cylinders, and making sure that cylinders are filled
correctly and removed from site after the process is completed.
·
Do not charge recovered refrigerant into another system until it has been
cleaned and checked.
·
After completion, label the unit to show when it was decommissioned and
emptied of refrigerant, that the label must be dated and signed, and ensuring
that there are labels on the equipment stating that it contains flammable
refrigerant.
DEHUMIDIFIERS WIRING BLOCK DIAGRAM
(For Service Technicians Only)
LGR 2800i LGR 3500i Owner's Manual
25
© 2023 Legend Brands, Inc.