PREPARATION
Before beginning assembly or operation of product, make sure
all parts are present. Compare parts with package contents list
and diagram. If any part is missing or damaged, do not attempt
to assemble, install or operate the product. Contact Customer
Care for replacement parts.
• Estimated Assembly Time: 20 minutes
• Tools required for assembly: Hacksaw
PACKAGE CONTENTS
Part
Description
A
Tank with UVC
B
O-ring
C
Cover
D
Lid
E
Bio-balls
F
Coarse filter pad
G
Fine filter pad
H
Adapter
6
Visit WWW.TOTALPOND.COM for information and tips.
Qty
Part
Description
1
I
Gasket
1
J
Locking ring
1
K
Small adapter
1
L
Small gasket
12
1
1
2
For maximum water flow, it is
recommended that the largest
tubing size for your pump is used. If
using 3/4 in. ID tubing, skip to step 2.
Step 1. If using 1 in. ID tubing, trim
the tubing adapter using a hacksaw
at the location indicated.
Step 2. Place the tubing adapter on
the lower hole of the tank and use
a gasket for it to be sealed tightly
when fastened.
Qty
2
Hand-tighten the locking ring on the
inside the tank to secure the tubing
2
adapter in place.
1
Step 3. Place the bio-balls in
1
the bottom of the tank.
Step 4. Place the fine (blue)
filter pad inside the tank. Then
place the coarse (black) filter
pad inside the tank.
Step 5. Place the tubing
adapter on the upper hole of
the tank and use a gasket for
it to be sealed tightly when
fastened.
Place the small adapter and
small gasket inside the tank and
hand-tighten the locking ring to
secure everything in place.
Connect the tubing from
the UV clarifier to the small
adapter.
Step 6. Turn over the filter
cover and locate the groove
along the outside edge of the
raise surface. Inspect the o-ring
to find the flat edge. One side
will have a curve and the other
side will be flat. Insert the flat
side of the o-ring down as you
place into the groove.
OPERATION INSTRUCTIONS
3
5
6
B
C
Please call Customer Care before returning item to store: 1-888-412-6001
1
1 in. ID
Tubing
Cut ring
2
I
H
J
4
F
G
L
J
K
I
H
B
C
la fiche
détaillée
7