Descargar Imprimir esta página

GE AHH18 Manual Del Propietário página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
4. PREPARE THE CASE
NOTE: Attach curtains to the air conditioner before
placing the air conditioner in the window.
A. Install top mounting rail (if not already installed)
with four type A screws.
3/8" Self Tapping
B. Slide left-hand curtain assembly into left end of
top and bottom mounting rail. Repeat for right
hand curtain assembly.
C. Fasten curtain retainer strips to the sides of the
outer case with four type A screws on each side.
panels in place.
Side Curtains
10
Screws
Top Channel
3/8" Self Tapping
Screws
5. PREPARE WINDOW FOR
INSTALLATION
A. Measure the width of the window opening.
B. Mark the center line on the inside windowsill.
A
B
A. Width of window opening
B. Center line
49-7762

Publicidad

loading

Este manual también es adecuado para:

Ahh24Ahh18dw