Descargar Imprimir esta página

Haier 2U40CEFFRA Manual Del Usuario página 24

Ocultar thumbs Ver también para 2U40CEFFRA:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29
1.
2U40CEFFRA
2U50FEFFRA
2U40S2SC1FA 2U50S2SF1FA
2U14CEFFRA
2U18FEFFRA
2.
Connection of pipes
To bend a pipe, give the roundness as large as possible not to crush the pipe ,
and the bending radius should be 30 to 40 mm or longer.
Connecting the pipe of gas side rst makes working easier.
The connection pipe is specialized for R32.
Spanner
Be careful that matters, such as wastes of sand s,water, , etc. shall not enter the pipe.
CAUTION
The standard pipe length is C m. If it is over D m, the function of the unit will be affected. If the pipe has
to be lengthened, the refrigerant should be charged, according to E g/m. But the charge of refrigerant
must be conducted by profes sional air conditioner engineer. Before adding additional refrigerant,
perform air purging from the refrigerant pipes and indoor unit using a vacuum pump,then
additional refrigerant.
CAUTION
Outdoor unit
Outdoor unit
21
Half union
Flare nut
Torque wrench
Indoor unit
B1
A1
B2
Indoor unit
A2
Outdoor unit
Indoor unit
Oil trap
B
Indoor unit
Forced fastening without careful centering may
damage the threads and cause a leakage of gas.
Pipe Diameter( )
Liquid side6.35mm(1/4")
Liquid/Gas side9.52mm(3/8")
Gas side 12.7mm(1/2")
Gas side 15.88mm(5/8")
B1
Outdoor unit
Indoor unit
A1
A2
B2
Indoor unit
Max.Elevation: A1 max =15m A2 max =15m
A3 max =15m
In case the elevation B is more than 5m,
oil trap shoud be installed every 5~7m
Max. Length: B1 max =20m B2 max =20m
(B1+B2) max =30m
In case the pipe total length (B1+B2) is more than
20m, the refrigerant should be charged, according
to 20 g/m.
Fastening torque
18N.m
42 N.m
55N.m
60 N.m
charge
Indoor unit
B1
A3
Indoor unit
B2

Publicidad

loading

Este manual también es adecuado para:

2u40s2sc1fa2u14ceffra2u50feffra2u50s2sf1fa2u18feffra