Installation
1
Marking the mounting location
□
Remove the set screw (DD) from the base of the
product posts.
□
Place the product in the desired mounting
location, using a level to position it accordingly,
and use a pencil to lightly mark the outline of the
posts.
□
Center the mounting bracket (BB) within the
marked post locations, and mark where the
screw holes will be drilled.
□
Repeat this step as needed for each bath
accessory.
NOTE: The included template (EE) may be used to mark the
mounting locations for the towel bars and pivoting tissue
holder : A and B for the pivoting tissue holder / A and C for the
18 in. towel bar / A and D for the 24 in. towel bar.
3
Installing the product
□
Place the post (A or C / E or F) over the mounting
bracket (BB) and secure it with the set
screw (DD), as shown.
□
Insert the towel bar (B or D) into the installed
post (A or C).
□
Repeat the first step for the remaining
post (C or A / F or E).
DD
BB
2
Installing the mounting brackets
□
Drill 1/4 in. holes in the previously marked
locations.
□
Push the plastic anchors (CC) flush into the dry wall.
□
Fasten the mounting bracket (BB) to the wall with
the wood screws (AA).
□
Repeat this step as needed for each bath
accessory.
NOTE: When mounting the products to a wood wall, fasten
the mounting brackets (BB) to the wall using the wood
screws (AA). There will be no need for drilling or plastic
anchors (CC).
A or C / E or F
5
l P
a e
e s
o c
t n
c a
1 t
8 -
5 5
-HD-GLACIER
CC
AA
BB
BB
AA
BB
DD
H
O
M
D E
P E
T O
f
r o
u f
t r
e h
a r
s s
s i
C .
O
M
a t
c n
. e