Descargar Imprimir esta página

Echo ES-255ES Manual De Instrucciones página 18

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Before you start
1. Locking ring
1. Blower pipe(main pipe)
1. Blower pipe(main pipe)
1. Blower pipe(main pipe)
Remove blower pipes
1. Blower pipe(main pipe)
1. Blower pipe(main pipe)
2. Blower pipe(fan head
nozzle)
2. Locking ring
3.
Align locking ribs (C) on the blower pipe(main pipe) with re-
cesses (B) in locking ring, and slide the blower pipe(main
pipe) into locking ring.
4.
After pushing upper blower all the way in fan case so that
line (D) will meet locking ring, rotate locking ring clockwise
1/8 turn to lock the blower pipe(main pipe) in place.
NOTE
Blower use will eventually loosen pipe connections. Exclusive
positive locking system allows pipes to be tightened. If loosen-
ing occurs, remove the blower pipe(fan head nozzle) and in-
stall according to instructions 5 & 6.
5.
Align tabs (F) with grooves (E) and slide the blower pipe(fan
head nozzle) over the blower pipe(main pipe) until there is
light resistance.
6.
Assemble the blower pipe(fan head nozzle) onto the blower
pipe(main pipe) until you feel light resistance. Do not force
connection. Hold the blower pipe(main pipe), and turn the
blower pipe(fan head nozzle) clockwise, engaging positive
locking channels until connection is firm. Do not force con-
nection.
1.
Release locking ring with a coin or screwdriver, and rotate
ring so that lock symbol (A) is at top of ring.
2.
Remove pipes from locking ring.
16

Publicidad

loading