Descargar Imprimir esta página

Cecilware MT-3UL-AF Manual De Instrucciones página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

wall (see figure 13).
5 - Insert the auger into the evaporator taking care to
accompany it to the end so as to prevent it from hitting
against the rear wall (see figure 14).
6 - Install the outer spiral. Slide it over the evaporator until its
front notch engages with the exposed end of the auger
figure 13
figure 14
shaft (see figure 15).
7 - Push the bowl towards the rear wall of the unit until it fits
snugly around the gasket and its front fastening hooks are
properly engaged (see figure 16).
8 - Use fresh product to chase any remaining sanitizer from
the bottom of the bowl(s). Drain this solution. Do not rinse
out the machine.
5. 4 IN-PLACE SANITIZATION
The In-Place Sanitization prior to starting the machine may be
performed, if needed, only as further precaution, in addition to
the Disassembled Parts Sanitization described before, but
never in lieu of it.
1 - Prepare two gallons of a warm (45-60°C / 120-140 °F)
s a n i t i z i n g s o l u t i o n ( 1 0 0 P P M a v a i l a b l e c h l o r i n e
concentration or 1 spoon of sodium hypoclorite diluted with
half a gallon of water) according to your local Health
Codes and manufacturer's specifications.
2 - Pour the solution into the bowl(s).
3 - Using a brush suitable for the purpose, wipe the solution
on all surfaces protruding above the solution-level and on
the underside of the top cover(s).
4 - Install the top cover(s) and operate the unit. Allow the
solution to agitate for about two minutes. Drain the solution
out of the bowl(s).
5 - Use fresh product to chase any remaining sanitizer from
the bottom of the bowl(s). Drain this solution. Do not rinse
out the machine.
MT UL AF
figure 15
figure 16
9

Publicidad

loading

Este manual también es adecuado para:

Mt-2ul-af