1
2
3
3
1
4
8 mm
4
English
Installation
Turn the water off at the main before
beginning!
Cut the plaster shield so that it extends ⅜" above the
surface of the finished floor.
Remove the flush housing screws using an 8 mm Allen
wrench (not included).
Do not discard the screws!
Remove the flush housing.
Make sure that the tub filler is level .
Install the 6 screws (the 3 reserved screws from the
flush housing plus the 3 included with the tub filler).
Tighten the screws using an 8 mm Allen wrench .
2