Descargar Imprimir esta página
ZUCCHETTI ZD4659 Instrucciones De Montaje
Ocultar thumbs Ver también para ZD4659:

Publicidad

Enlaces rápidos

ISY - WOSH - SIMPLY B.
BELLAGIO - SAVOIR
I
EN
F
D
E
RU
PL
ZD4659 / ZD5659 / ZD1659 / ZD3659
ZD4660 / ZD5660 / ZD1660 / ZD3660
ZD4661 / ZD5661 / ZD1661 / ZD3661
ZD4662 / ZD5662 / ZD1662 / ZD3662
ZSB5659
ZSB5660
ZSB5661
ZSB5662
Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it
ISTRUZIONI PER L'INSTALLAZIONE DELLA RUBINETTERIA
INSTRUCTIONS FOR THE INSTALLATION OF THE FAUCETS
INSTRUCTIONS POUR L'INSTALLATION DE LA ROBINETTERIE
MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN
INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA
ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ
INSTRUKCJE INSTALACJI ARMATURY
ZB1659 / ZB2659
ZB1660 / ZB2660
ZB1661 / ZB2661
ZB1662 / ZB2662
Zucchetti Rubinetteria S.p.A.
ZW5659
ZW5660
ZW5661
ZW5662
ZSA659 / ZSV659
ZSA660 / ZSV660
ZSA661 / ZSV661
ZSA662 / ZSV662
1

Publicidad

loading

Resumen de contenidos para ZUCCHETTI ZD4659

  • Página 1 MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ INSTRUKCJE INSTALACJI ARMATURY ZW5659 ZD4659 / ZD5659 / ZD1659 / ZD3659 ZD4660 / ZD5660 / ZD1660 / ZD3660 ZW5660 ZD4661 / ZD5661 / ZD1661 / ZD3661 ZW5661...
  • Página 2 INSTALLAZIONE / INSTALLATION...
  • Página 3 INSTALLAZIONE / INSTALLATION 17mm ZD4 / ZD5 ZB1 / ZB2 (mm) 6-11 12-18 19-25 26-32 33-39...
  • Página 5 ZD1 / ZD3 / ZD4 / ZD5 ZB1 / ZB2...
  • Página 6 ZB1 / ZB2 INSTALLAZIONE / INSTALLATION...
  • Página 7 ZSA / ZSV...
  • Página 9 Recommended temperat.: 60-65°C Zucchetti taps can be used with electric storage water heathers and instant gas types, centralised system, combi wall-mounted gas boilers and district heating systems. Before connecting the taps we recommend draining the system thoroughly; it is also advisable to install under basin stop valves with filter (art. Z9126P). Should the water pressure be higher than 5 bar, a pressure reducer should be fitted upstream of the supply pipes.