Descargar Imprimir esta página

Panasonic WH-ADC1216H6E5C Manual De Instalación página 30

Ocultar thumbs Ver también para WH-ADC1216H6E5C:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 32
30. Tank re-heat temp.
Set temp to perform reboil of tank water.
(When boiled by heat pump only, (51°C – Tank re-heat temp) shall become
max temp.)
Setting range is -12°C ~ -2°C
31. Sterilization
Set timer to perform sterilization.
1 Set operating day & time. (Weekly timer format)
2 Sterilization temp (55~75°C  If use back-up heater, it is 65°C)
3 Operation time (Time to run sterilization when it reached setting temp
5min ~ 60min)
User shall set whether to use or not to use sterilization mode.
3-5. Service Setup
32. Pump maximum speed
Normally setting is not necessary.
Please adjust when need to reduce the pump sound etc.
Besides that, it has Air Purge function.
When *Pump fl ow setting is Max. Duty, this duty set is the fi x pump duty run
during room side operation.
33. Pump down
Operate pump down operation
34. Dry concrete
Operate concrete curing operation.
Select Edit, set temp for every stage (1~99 1 is for 1 day).
Setting range is 25~55°C
When it is turned ON, dry concrete starts.
When it is 2 zone, it dries both zones.
35. Service contact
Able to set name & tel no. of contact
person when there is breakdown
etc. or client has trouble. (2 items)
30
Initial setting: -8°C
Initial setting: 65°C 10min
Initial setting: Depend on model
Service setup
Pump down:
Service setup
Service contact:
Select
Service setup
12:00am,Mon
ON
Confi rm
40°C
35°C
30°C
1
2
3
12:00am,Mon
Contact 1
Contact 2
Confi rm
-12°C ~ -2°C
①  ③
Flow rate
Max. Duty
88:8 L/min
0xCE
Select
Service setup
Pump down operation
Pump down:
in progress!
ON
OFF
Confi rm
45°C
40°C
35°C
5
6
4
Stage
Contact-1: Bryan Adams
ABC/ abc
0-9/ Other
A B C D E F G H I J K L M N O P Q R
S T U V W X Y Z
a b c d e f g h i
j k l m n o p q r s t u v w x y z
Select
Enter
12:00am,Mon
Operation
Air Purge
17:26, Wed

Publicidad

loading