Descargar Imprimir esta página

enphase HCS EVSE Serie Manual De Usuario página 24

Publicidad

Idiomas disponibles

Idiomas disponibles

HCS EVSE User Manual
EVSE Mounting for Solid-Wall Construction
To secure the unit in concrete, pre-drill appropriately sized holes
and use multi-set or wedge anchor hardware at both mounting
points.
To secure the unit in brick or stone, pre-drill appropriately sized
holes and use sleeve anchors at both mounting points.
The included plastic angle washers can be oriented to allow bolts
to be fastened either at an angle or perpendicular to the mounting
surface.
NOTE there are two different sets of plastic angle washers
included. Select those washers that best accommodate the
mounting hardware "angle of attack" and orient them accordingly.
NOTE that if the head of the mounting hardware is smaller than
the ⅜" (1 cm) plastic angle washer aperture, an additional flat
washer will need to be placed between the plastic angle washer
and the mounting hardware.
Machine screw size ¼"- 20 hardware is recommended for
mounting the EVSE. Screw shafts of at least 2" (5.1 cm) are
recommended. The EVSE plastic angle washer hole size is ⅜"
(1 cm) in diameter, ensure the screw heads are of a larger
diameter. Place appropriately sized washers between the screw
heads and the HCS enclosure mounting flanges.
Figure 9: Mounting EVSE to a Solid-Wall
17"
24

Publicidad

loading

Este manual también es adecuado para:

Hcs-40Hcs-40p 6-50pHcs-40p 14-50pHcs-50Hcs-50 6-50pHcs-50 14-50p ... Mostrar todo