Descargar Imprimir esta página

Sunny Health & Fitness UPRIGHT ROW-N-RIDE 077G Manual Del Usuario página 12

Publicidad

Idiomas disponibles

Idiomas disponibles

BATTERY INSTALLATION & REPLACEMENT
BATTERY INSTALLATION:
1. Take out 1 AA battery from manual bag.
2. Press the buckle of battery cover on the Meter (No. 41), then remove battery cover.
3. Install 1 AA battery into the battery case on the back of the Meter (No. 41). Pay attention to the
battery + and – poles before installing.
4. Press the buckle of battery cover, then put the battery cover back to the back of the Meter (No. 41).
The installation is complete!
BATTERY REPLACEMENT:
1. Press the buckle of battery cover on the back of the Meter (No. 41), then remove battery cover.
2. Remove the 1 old AA battery in the battery case and install 1 new AA battery into the battery case
on the back of the Meter (No. 41). Pay attention to the battery + and – poles before installing.
3. Press the buckle of battery cover, then put the battery cover back to the back of the Meter (No. 41).
The replacement is complete!
NOTE: Dispose battery according to your state and regional guidelines.
Battery
Battery Cover
11

Publicidad

loading