3
INSTALLATION -
SUB FLOOR MUST BE STRUCTURALLY SOUND & FREE OF MOVEMENT / FLEXING
The tub is provided with an integral base for easier installation. Position the bath on the floor and slide into place until the
tub is resting on the rear stringer. The base does not need to contact the floor for proper installation. The base on the
2396 and 2397 models is raised above the floor to facilitate drain installation. Check level, front to back and side to side.
Also check drain clearance hole in sub floor. To secure the tub to wood studs, use sheet rock screws with washers
immediately above the flange of the tub. To secure the tub to steel studs, use drywall screws and flat washers.
(See Step 4)
Caution: Take Extra Care When Driving Nails or Screws To Avoid Damaging The Tub.
The tile or similar finished floor will be butted against the bottom of the tub apron also holding the tub in place.
NOTE: Warranty will be voided if the drain is installed after the tub has been set in place.
4
Below is shown typical cross sections of the tub rim showing typical wall constructions.
WOOD STUDS
STUD
SHIM
DRY WALL
TILE
DRYWALL SCREW
CAULKING/
SEALANT
DRYWALL
SCREW
TUB
BEDDING MATERIAL (MORTAR, SANDMIX, ETC.) IS ACCEPTABLE
NAIL
OR
DRYWALL
SCREW
EVERY STUD
STEEL STUD
SHIM
WASHER
DRY WALL
TILE
CAULKING/
SEALANT
DRYWALL
SCREW
TUB
51 x 102mm (2 x 4) WOOD STRINGER FULL LENGTH
UNDERLAYMENT
FINISHED TILE FLOOR
SUB FLOOR
STEEL STUDS
WASHER
DRYWALL
SCREW
- 2 -
FOR STEEL STUDS SUPPORT
THE WOOD 2 X 4 STRINGER
TO THE FLOOR IN 3 PLACES
STEEL STUDS
• •
•
• •
• •
•
•
•
•
•
•
•
•
•
•
•
INSTALL
ON STUD
790041-400 Rev. P 3/17
WOOD
2 x 4
STRINGER
2 x 4
SUPPORT
TO
FLOOR/
SCREWED
TO STUD