Descargar Imprimir esta página

Desoutter AFDE610 Serie Manual Del Usuario página 25

Ocultar thumbs Ver también para AFDE610 Serie:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 30
SETTING TAPPING OPERATION
Note 1: lt is important that the advance
rate of the tool is set to match the pitch
of the thread which is to be tapped.
An incorrect advance rate will result in
a deformed thread, this will be more
noticeable in plastics or light alloy
materials.
Note 2: The retract rate should be set to
withdraw the tap at a slightly faster rate
than it advanced, this will ensure a clean
withdrawal.
● Mount a tool, with the selected tap securely
retained in the chuck, above a test block to
carry out sample tapping operations.
● The end of the tap MUST be at least 14mm
(9/16in) above the test block, to allow for the
tapping head reversing engagement travel.
● Set the gap between Figure 5 (2) and (1) to
equal the tapping depth PLUS the distance
the tap is above the work piece.
● Adjust Figure 3 (11/13) to give the required
advance, retract feeds for the operation.
● Carry out a trial tapping operation and inspect
the finished thread form, adjust as necessary
Figure 3 (11/13) and repeat until information
in NOTES 1 and 2 are satisfied.
SERVICING REQUIREMENTS
General Notes
Use the following lubricants:
● Grease - molykote Longterm W2 for splines
and guide rod.
● Grease - Molykote G68 for Gearbox.
● Grease - Molykote PG75 Plastislip for
O-Rings.
● Grease - BP FGOOEP for Cylinder bore.
Cleaning
Requirements:
(1) Container to immerse components.
(2) Good quality clean paraffin.
● Soak the components in the container
containing the paraffin.
● Ensure full immersion, agitate components to
ensure that air passages are flushed through.
● Remove components from the container,
thoroughly dry and blow through air passages
to remove moisture.
● Place components in an air tight container
until required for assembly.
● Dispose of the dirty paraffin in accordance
with health and safety regulations.
05/2016
MAINTENANCE INSTRUCTIONS
The bearing sleeve complete is under
spring (19) compression. whilst
resisting the thrust due to the spring
(19), carefully unscrew and remove
the bearing sleeve complete followed
by the spring.
● Service should be carried out at intervals of
1000 hours'use. Always quote tool model
number, serial number and spare part
number when ordering spares.
● All torque figures ± 5%.
● Dismantle the tool using the exploded view.
● Clean all components and inspect for wear or
damage, exchange if necessary.
● Apply new lubricant to the relevant parts in
accordance with list.
● Replace the front seal after dismantling the
tool.
● Special tools shown in exploded view are in
addition to normal workshop tools.
When disposing of components,
lubricants, etc... ensure that the relevant
safety procedures are carried out.
Protective gloves and eye protection
should be worn during cleaning of parts.
Eating or smoking is prohibited when
cleaning, dismantling or assembling tool.
441513
Issue no : 12
Series : C
25 / 76

Publicidad

loading