Descargar Imprimir esta página

Pfister Virtue LF 49 Serie Manual De Instrucciones página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

10
10G
10F
10B
10D
10E
10D
10B
10B
10A
10 HOSE CONNECTION
From underneath sink, push the Center Connector (10A) onto receiving Tube (10B),
until unable to push any further. Pull down on the quick connect housing (10A). If the
housing and the Inner Collet (10C) separate slightly but do not pull off receiving Tube
(10B), the connection is secure.
Slide the End Connectors (10D) with arrow (10E) pointing up onto the Valve Bodies
(10F). Push the End Connectors (10D) all the way up until completely seated. Be
careful not to damage O-Rings (10G).
11
11A
11 POP-UP INSTALLATION
Install and adjust Pop-Up (11A) using separate instructions supplied with the Pop-Up
assembly.
10G
10F
10A
10D
10B
10C
10C
10A
ENGLISH
12
12D
12C
12A
HOT
12D
12 WATER SUPPLY CONNECTIONS
First, thread Inlet Connectors (12A) into Water Supply Lines (12B). Then, insert Inlet
Connectors (12A) into Valve Bodies (12C). Hot water supply lines go into left inlet.
Cold water supply lines go into right inlet. (Supply lines not included). Please follow
manufacturer's instructions when installing supply lines. Next, insert Clips (12D) into
Valve Body Holes (12E), to secure unit.
WARNING: Do not twist Inlet Connectors (12A) once installed!
13
13 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
4
12C
12D
12B
12A
12B
COLD
12E

Publicidad

loading