Descargar Imprimir esta página

RedMax BCZ2601S-CA Manual De Instrucciones página 18

Publicidad

SE1
(1)
SE2
SE3
SE4
18
[BCZ2601S]
[BCZ2601SU]
[BCZ2601S-CA]
[BCZ2601SU-CA]
[BCZ2601SW]
[BCZ2601SW-CA]
English
6. Set up
■ INSTALLING HANDLE
• Mount the handle to the shaft tube and clamp it at a
location that is comfortable to you. (SE1)
(1) About 19 inches (48cm)
(2) About 14.5 inches (37cm)
■ INSTALLING DEBRIS GUARD
• Put the debris guard on the gear box, attach it with
the screws and hardware provided. (SE2)
■ INSTALLING CUTTING HEAD (SE3)
1. While locking the gear shaft, by inserting the
supplied tool into the upper holder on the gear box,
loosen and remove the hexagon nut(left-handed)
2. Fit the line head assembly to the gear shaft over the
holders. Hand-tighten it securely.
IMPORTANT
You need not holder (B) and nut when installing the
cutting head.
■ BALANCE UNIT
1. Put on strap and attach unit to strap.
2. Slide clamp up or down until unit balances with head
just touching on the ground. (SE4)

Publicidad

loading

Este manual también es adecuado para:

Bcz2601suBcz2601swBcz2601sBcz2601su-caBcz2601sw-ca