Descargar Imprimir esta página

OVE SIDNEY 32 Instrucciones De Instalación página 9

Panel lateral

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Ensure the base and walls are leveled. Place the metal track (B) approximately 20mm (3/4in) from the edge
of the base to the center of the metal track. Ensure the metal track (B) is leveled, then mark the holes clearly
on the wall using a pencil.
2. Remove track and drill pilot holes in the marked locations. Using Φ8mm (5/16in) ceramic drill bit.
3. Insert the wall anchors (EE) using a rubber mallet until the wall anchors are flush with the wall.
4. Replace and secure the metal track (B) with screws (CC). Do not overtighten.
Note: Insert the door panel's bottom seal strip (L) at the base of door
panel (C) and cut the surplus with a cutter. Place the door panel (C)
inside the shower enclosure to facilitate future steps.
Helpful Hint
Make sure there
is a support stud
located behind the
drywall, behind the
tracks!
WALL TRACK INSTALLATION
9
1
B
2
Φ 8mm
5/16in
3
EE
4
B
CC

Publicidad

loading