Red
Outlet 1
Outlet 2
Outlet 3
Outlet 4
Wiring Diagram
Install the New Solenoid Wiring Loom
Connect the new wiring loom to the solenoids and circuit board according
to the Wiring Diagram.
Verify all connectors and grommets are secured.
IMPORTANT! Position the wiring looms so that they are not pinched when
the cover is secured.
Install the case cover using the new screws provided.
Complete the Installation
Connect the power supply and turn on the water supply.
Check for leaks.
Kohler Co.
Red
Orange
Outlet 5
Outlet 6
3
Red
Red
Red
Yellow
Green
Violet
Black
Black
Brown
Black
Black
White
Black
1062948-9-A