11
11B
11A
11 SECURING HOSE CONNECTIONS
Slide Clips (11A) onto End Bodies (11B), beneath the End Connectors (11C).
12
12A
12A
12C
12D
12 FLANGE INSTALLATION
Place Plastic Ring (12A) and Flange (12B) over Valve Body (12C) covering
the Valve Body Washers (12D). Secure by screwing the Plastic Nut (12E) onto
the Valve Body (12C).
CLOSED
13
OPEN
13A
13A
13 VALVE FUNCTION
COLD valve: close-counterclockwise, open-clockwise; HOT valve: close-
clockwise, open-counterclockwise. The Spout (13A) can be rotated around the
Faucet Body in any direction.
11B
11C
11A
12E
12E
12B
12B
12A
12A
12C
12D
12E) onto
12E
LEVER HANDLES
HOT
COLD
OPEN
CLOSED
OPEN
CROSS HANDLES
CLOSED
OPEN
CLOSED
COLD
ENGLISH
A
14
14B
14A
14A
14 HANDLE INSTALLATION
Before proceeding, Valve Stems (14A) are to set be in the closed position.
A. Installing Lever Handle:
Installing Lever Handle: Attach Handle Hub (14B) in desired position onto
Valve Stem (14A) and secure with Screw. Hand tighten Decorative Lever (14C)
onto Handle Hub. Attach Button.
B. Installing Cross Handle:
Installing Cross Handle: Attach Handle Hub (14D) onto Valve Stem (14A).
Attach Cross Handle onto Handle Hub and secure with screw. Attach Button.
C. Installing French Lever Handle:
Installing French Lever Handle: Attach Handle Hub (14E) onto Valve Stem
(14A). Attach French Lever onto Handle Hub and secure with screw. Attach
Button.
15
15A
15A
15 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (15A) to Faucet Inlets (15B). (Supply lines and
fi ttings are not included.) Please follow manufacturer's instructions when
installing supply lines.
POP-UP DRAIN BODY INSTALLATION STEPS
Your faucet can be installed with a 50/50 Pop-Up or
an All Metal Pop-Up:
For a 50/50 Pop-Up installation:
For an All Metal Pop-Up installation:
4
B
C
14C
14D
14E) onto Valve Stem
14E
15B
Go To Steps 16 & 17
Go To Steps 16 & 17
Go To Steps 18 & 19
Go To Steps 18 & 19
14E
14A
14A