20
20B
20D
20 POP-UP BALL ROD PREPARATION
Unscrew Nut (20A) from the Drain Body (20B) and retain one Packing Ring
(20C) inside the Ball Rod Opening (20D). Take off the Spring Clip (20E) from
the Ball Rod (20F).
20F).
20F
21
21A
21A
21H
21C
21B
21E
21C
21 POP-UP BALL ROD INSTALLATION
Drop the Stopper (21A) into Drain Body (21B) with the Off-Set (21C) facing the
rear. Place Nut (21G) and the other Packing Ring (21H) onto Ball Rod (21D).
Insert the Ball Rod (21D) into the Ball Rod Opening (21E) through the Stopper
Hole (21F) and secure with Nut (
21F) and secure with Nut (
21F
21G).
20C
20A
20A
20E
20F
21G
21D
21F
21E) through the Stopper
21E
ENGLISH
22
20E
20E) from
22 POP-UP ROD LINKAGE & ADJUSTMENT
Place one end of Spring Clip (22A) onto the end of Ball Rod (22B). Insert the
Ball Rod (22B) through a hole of Strap (22C). Connect the other end of Spring
Clip (22A) to Ball rod (22B). Insert bottom of Lift Rod (22D) into the hole on
top of Strap (22C). Adjust the Lift Rod (22D) height by tightening the Thumb
Screw (22E) on the Strap (
22E) on the Strap (
22E
hole of Strap (22C). Be sure to leave enough space between Lift Rod Knob
(22F) and Spout Head (
22F) and Spout Head (
22F
23
23 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below
the sink.
6
22F
22D
22E
22A
22A
22C
22B
22B
22A
22A
22C) or by placing the Ball Rod (22B) on another
22G) when Lift Rod is down.
22G