Installation Of Appliance
Follow accompanying ducting instructions carefully.
This appliance is designed to always be vented outdoors.
The Countertop Cutout, Cabinet Front Cutout and Duct
Opening should be prepared according to the illustration
on pages 1 and 2.
Install the Lower Control Panel in the bottom of the
Cabinet Cutout as shown using screws from Hardware
pack. (Figure 1).
Figure 1
Position unit in the Countertop Cutout. Main Control Panel
should overlap top of Lower Control Panel as shown.
(Figure 2).
Figure 2
All manuals and user guides at all-guides.com
(25.56 cm)
4
NOTE: For some cabinet styles, it may be necessary to
reinforce the front of the cabinet by attaching a brace
from front to rear inside the cabinet under the Burner Box.
Install ductwork per ducting instructions provided. Duct
openings in cabinet are shown in the drawing on page 1.
Make electrical and gas connections as described below
in this section of the instructions.
The installation of this appliance must conform with local
codes or, in the absence of local codes, with the latest
edition of the National Fuel Gas Code, ANSI Z.223.1 USA
or current CAN/CGA-B149 INSTALLATION CODE.
The electrical supply required is 110/120-volt, A.C., 15
amp, 60 Hz. This appliance is equipped with a grounded
type power cord. A grounded outlet must be provided. It is
recommended, for convenience, this outlet be located in
the area shown in the shaded illustration. This appliance,
when installed, must be electrically grounded in
accordance with local codes or, in the absence of local
codes, with the latest edition of the National Electrical
Code ANSI/NFPA No. 70 USA or current CSA
STANDARD C22.1 Canadian Electrical Code part 1.
²
10
1/16
Servicing Cooktop
When servicing cooktop it is necessary to remove the
main top, prior to removing the control panel.
² (118.90 cm)
46
13/16