Descargar Imprimir esta página

Bradley SN2003/AST4 Instrucciones De Montaje página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

SN2003/AST4, SN2003/AST4-F, SN2023/AST4
3
Connect Drain
Off-Line Vent (Type A or O): Connect 1-1/2" P-Trap and
drain piping (supplied by installer) to the drain spud .
Centrally Rising Vent (Type B or H) or models with
optional paper towel dispensers: Connect the vented
P-Trap (provided) and drain piping as shown:
4
Turn on Water, Test and Adjust Unit
Check to make sure stop valves
are open before turning on water.
A
Turn on water supply and check for leaks . Activate
each push/foot button to purge air from the lines .
Using the cover, turn
the cartridge gently until
D
desired water temperature
is reached . Do not turn past
stops as this may damage
the unit . Push the cover
down and tighten the screw .
6
H
8/24/2020
Strainer
Drain Spud
Tailpiece
P-Trap
B
Adjust air-valve meter timing, if desired
(hand-operated units only) .
Air Metering Timer
(Hand-operated push button only)
C
Loosen the cap screw about
¼" (4–6 turns) and lift up
the cover (do not remove) .
This valve is NOT factory preset.
Upon installation, the temperature
of this valve must be checked and
adjusted to ensure delivery of a
C
safe water temperature. Water in
excess of 110°F (43°C) may cause
scalding.
Bradley • 215-1072 Rev. L: ECO 20-00-015
Installation
1-1/2" NPT Vent Pipe
(supplied by installer)
1-1/2" NPT Tee
1-1/2" NPT Close
Nipple
1-1/2" Drain (supplied
by installer)
-
+

Publicidad

loading

Este manual también es adecuado para:

Sn2003/ast4-fSn2023/ast4