Descargar Imprimir esta página

EuroLite RGB PAR-1500 DMX Color Changer Manual Del Usuario página 19

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
Installing/Replacing the lamps
Before replacing the lamp, unplug mains lead and let the lamp cool down (approx. 20 minutes).
During the installation do not touch the glass-bulbs bare-handed! Please follow the lamp manufacturer's
notes!
Do not install lamps with a higher wattage! Lamps with a higher wattage generate temperatures the device
was not designed for. Damages caused by non-observance are not subject to warranty.
For the installation, you need three 230 V/575 W GX-9.5 HPL lamps.
During the operation, the lamp reaches temperatures of up to >1000° C.
Procedure:
Step 1: Unscrew the fixation screws on the outside housing.
Step 2: Remove the lens-colorfilter-unit using the mini brackets.
Step 3: If replacing the lamp, remove the old lamp from the lamp-socket.
Step 4: Insert the new 230 V/575 W GX-9.5 HPL lamp into the lamp-socket.
Step 5: Replace the lens-colorfilter-unit and tighten the screws.
Do not operate this device with opened lens-colorfilter-unit!
Overhead rigging
The installation of the projector has to be built and constructed in a way that it can hold 10 times the weight
for 1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
All manuals and user guides at all-guides.com
DANGER TO LIFE!
Only install the lamps with the device switched off!
Unplug from mains before!
CAUTION!
The lamp has to be replaced when it is damaged
or deformed due to the heat!
19/45
41601045_V_1_2.DOC

Publicidad

loading