Installation
1
Preparing for installation
CAUTION: Always shut off the water supply before
removing an existing faucet or replacing any part of a
faucet. Open the faucet handle to relieve water pressure
and ensure that the water is completely shut off.
□
Shut off the water supply to the tub and
shower.
□
Verify that the hole sizes and positions of the
holes in the wall are correct
□
The shower and tub spout outlet holes
should be 1-1/4 in. diameter.
□
Refer to Step 2 for valve access hole
dimensions.
□
The recommended valve depth to the
nished wall is 1-1/2 in. min. to 2-1/2 in.
max.
□
Ensure that the valve body (D) cover is ush
with the nished exterior surface of the wall.
Position the valve body (D) correctly in the
wall with the side marked "UP" pointing up. The
8 in. minimum from the valve body (D) to the tub
spout (J) is required for proper operation.
30 in.
Shower Only
48 in.
Shower Only
1 1/4 in. Diamter
1 1/4 in. Diameter
48 in.
Tub & Shower
Refer to
the step 2
D
8 in. Min.
30 in.
Tub & Shower
2
Installing the valve body and
removing the plaster guard
□
A. Thin Wall Installation
"Thin Walls" are usually built with materials such
as berglass which will not support the valve.
Please keep the plaster guard (L) attached to the
valve as it will be your main source of support.
□
B. Thick Wall Installation
"Thick Walls" are usually built up with materials such
as cement board, drywall, tile, etc. The plaster guard
(L) is positioned so that it is ush with the nished
wall. This ensures that the valve will be at the correct
position to accept the trim. The depth for the valve
body (D) in wall is measured from the center of the
shower outlet to the nished wall surface. The
accepted depth distance is 1-1/2 in. to 2-1/2 in.. When
the depth distance is 1-1/2 in. to 2 in., there will be
interference between the plaster guard (L) and
escutcheon (E). It is recommended that you remove
the plaster guard (L) after the wall installation.
□
Unscrew the screws (K), and remove the plaster
guard (L).
NOTE: Be sure to position the valve body (D) correctly in
the wall, with the side marked "UP" facing upward.
1-1/2 in. to 2-1/2 in.
Finished wall
L
K
7
Please contact 1-855-HD-GLACIER for further assistance.
Finished wall
D
L
HOMEDEPOT.COM/GLACIERBAY
D
L