Inspection And Maintenance Plan - Gude ISG 1200 ECO Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 75
ENGLISH

Inspection and maintenance plan

26
Repairs and works specified in these Instructions may only be performed by qualified authorised staff.
Use only original accessories and original spare parts.
Regular servicing period
Engine oil
(10W-40)
Petrol hose
Exhaust system
Choke
Cable starter
Air filter
Petrol filter
Spark plug
Tip: To ensure reliable operation of the electric generator, we strongly recommend using fuel additives and
performing 2-3 test operations after a longer time of not using the unit.
Before any
start-up
Inspection
Change
Inspection
Clean
Change
Clean
Inspection
Clean
After 1 month
After 3
months or
50 hours of
operation
14
After 6
After 12
months
months

Publicidad

Tabla de contenido
loading

Tabla de contenido