Restart the entire system to fully charge the ACD battery pack.
7.
Disconnect the panels and use the system's loads to discharge
8.
the entire ACD battery pack (the inverter's "On-Grid DOD"
screen should still be set at 95%; as described in point 4).
Shut down the entire solar installation and reinstall the B bat-
9.
tery module in the ABCD battery pack.
Restart the entire system to fully charge the ABCD battery
10.
pack.
Disconnect the panels and use the system's loads to discharge
11.
the entire ABCD battery pack (the inverter's "On-Grid DOD"
screen should still be set at 95%; as described in point 4).
Connect the panels and reset the value of the inverter's
12.
On-Grid DOD screen to its original value from before starting
the whole procedure.
NOTE: Installing a new battery module can take several
days, with all the charging and discharging processes,
depending on the available load on the system.