Descargar Imprimir esta página

Nilfisk Hybrid 7 Booster Floor Instrucciones De Uso página 35

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 68
5.5. Water connection
For technical specifications on water supply, refer to
section 3.4.
Before the unit is connected to the water supply
pipe, the supply line should be rinsed thoroughly
in order to remove impurities.
When installing piping, avoid air traps. Use clamp
connections for all pipe connections to the unit for
easy maintenance and disassembly.
The connection for water must be made at the
top of the unit. Refer to layout drawing in section
12.2.
Minimum diameter of the supply pipe must be at
least Ø38 external (Ø35mm internal).
The unit must be fitted with a closing valve for
water on the inlet (see image 110009521).
For best performance, install a filter on the inlet to
prevent impurities (refer to image below).
To minimize pressure loss in the supply line:
Avoid long pipe lines.
Use low pressure resistance ball valves.
Avoid fittings with high pressure loss.
6. System preparation
6.1. Start up of new system
To ensure smooth start-up of the new system, follow
these guidelines.
6.2. Bleeding guidelines
6.2.1. Bleeding the pipe system
6.2.2. Bleeding the pump
110005283
A
6.3. Adjustments
6.3.1. Instruction and setup
Refer to the user guide and software manual for gen-
eral machine operation instructions.
Close water and air supply after use.
Leaving the air supply open may allow air to enter
the water pipe.
Regular bleeding may be necessary after pro
longed shutdowns.
Start the pump to force any remaining air pockets
to the top of the pump.
Stop the pump.
Loosen the relief plug 1-2 turns again and bleed
until only water flows.
Tighten the relief plug.
Never loosen the relief plug while the pump is in
operation as this may damage the gasket.
A
DETAIL A
The mainstation is now ready for use.
0627131
110009489
32

Publicidad

loading

Este manual también es adecuado para:

Bf4Bf8Hybrid 7 bf4Hybrid 7 bf8