TRAPP TRF 50 Manual De Instrucciones página 58

Trituradores forrajeros
Ocultar thumbs Ver también para TRF 50:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Model TRF 60
Assembly of grain feeder
Model TRF 50 and TRF 60
Place the grain feeder (1) over the green crop


feeder (2), secure it with screw (3), washer (4)
and tighten with nut (5) through the internal
part of the green crop feeder (2).
Other models
Place the funnel of the grain (1) on the funnel
of green (2) as per the image it is coupled in the
existing fixing plug in the funnel of green (2).
58
4
3
To operate with green products
(foliage):
Remove the sealing cover (1).


Remove the green crop feeder cover (4).


Place the flat strainer (2), as the material will exit


through the upper part of the shredder.
The green products are placed into the green crop


feeder (3), and then forwarded to be processed.
The end product leaves the shredder through the
upper part.
In models TRF 50, TRF 60 and TRF 70, the


processed material leaves through the lower part.
Attention!
The motor may burn due to overload if an
excessive amount of material is introduced.
www.trapp.com.br

Publicidad

Tabla de contenido
loading

Tabla de contenido