Descargar Imprimir esta página

Haier AP48DS1ERA Manual De Instrucciones página 21

Ocultar thumbs Ver también para AP48DS1ERA:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Installation Procedure
Installation inspection and test run:
Please operate unit according to this Manual.
Items to be checked during test run. Please made a " " in " "
Are there any gas leakage?
How is insulation at piping connection carried out?
Are electric wires of indoor and outdoor unit firmly inserted into terminal block?
Is electric wiring of indoor and outdoor securely fixed?
Is drainage securely carried out?
Is earth line ( grounding ) securely connected?
Is power supply voltage abided by the code?
Is there any noise?
Is control display normal?
Is cooling operation normal?
Is room temp. regulator normal?
19
Test Run

Publicidad

loading

Este manual también es adecuado para:

Ap48ks1erasAp48ks1eraAp48ds1erasAp60ks1eraAp60ks1eras