Descargar Imprimir esta página

Sunny Health & Fitness SF-E905 Manual Del Usuario página 20

Ocultar thumbs Ver también para SF-E905:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

BATTERY INSTALLATION & REPLACEMENT
Battery
Cover
BATTERY INSTALLATION
1. Take out 2 AA batteries from meter box.
2. Press the buckle of battery cover on the Meter (No. 38), then remove battery cover.
3. Install 2 AA batteries into the battery case on the back of the Meter (No. 38). Pay attention
to the battery + and – poles before installing.
4. Press the buckle of battery cover, then put the battery cover back to the back of the Meter
(No. 38).
The installation is complete!
BATTERY REPLACEMENT
1. Press the buckle of battery cover on the back of the Meter (No. 38), then remove battery
cover.
2. Remove the 2 old AA batteries in the battery case and install 2 new AA batteries into the
battery case on the back of the Meter (No. 38). Pay attention to the battery + and – poles
before installing.
3. Press the buckle of battery cover, then put the battery cover back to the back of the Meter
(No. 38).
The replacement is complete!
BATTERY DISPOSAL
Dispose batteries according to the laws and regulations of your local region. Some batteries
may be recycled. When disposing or recycling, do not mix battery types.
38
19
Battery

Publicidad

loading