Descargar Imprimir esta página

Palram Snap & Grow 6'x8' Instrucciones De Montaje página 2

Ocultar thumbs Ver también para Snap & Grow 6'x8':

Publicidad

".
-
-.1
".
-
.
II-
-
.
.
-
-
--
-
-
-.
-
-
-
'..
0
A.
Safety Advice
We
strongly recommend the
use
of work
gloves
during
assembly
.
Do
not attempt to
assemble
the greenhouse
in
windy
or
wet conditions.
Do
not touch overhead power
cables
with the aluminum
profiles. Always wear shoes and
safety
goggles when working with extruded aluminum.
Dispose
of
all
plastic bags safely
-
keep
them out of
reach
of
small
children. The greenhouse must
be
positioned
and fixed on
a
flat
level surface. Do
not
lean
against or push the greenhouse during construction.
Keep
children away from the assembly
area.
Do
not position your greenhouse
in
an area
exposed
to excessive wind.
Do
not attempt
to assemble this greenhouse if you
are
tired, have taken drugs or alcohol or
if you
are
prone to dizzy
spells. If using
a
step ladder or
power tools
ensure
that
you
follow
the manufacturers
safety advice. Hot items such
as
recently
used grills,
blowtorches,
should kept
away
from the greenhouse
walls.
We
recommend the greenhouse
is
bolted
to
a
concrete
base or slabs (fix
hinges
are
not
supplied). However, if you
want
to fix directly
in
to the concrete ensure there
are
no
hidden
pipes or cables
in
the ground
before inserting the
pegs.
Care &
Maintenance
When your greenhouse needs to be cleaned,
use
a
mild detergent solution and rinse with
cold clean water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the
clear panels.
For
replacement
parts
-
call
our service
line.
For
additional information
please visit our
web
site:
www.palramapplications.com
Tools
&
Equipment
Tape measure
Work gloves
Plastic
or
rubber mallet
Phillipshead screwdriver
Step
ladder
Scissors
Spirit
level
-
For
base
alignment
Cloth
General Advice
This
multi-part
assembly
is
best achived by
two
people.
Allow
at least
half
a
day for assembly process.
Site
selection instruction-choose
a
sunny
level
position away from overhanging
trees. If you are
fixing your greenhouse directly to
a
solid
concrete foundation
use
the
pre
drilled
holes
in
the
metal base supplied. The
component
parts should be checked and laid
out
close at hand. Keep
all
small parts (screws etc.)
in
a
bowl
so
they
do
not get
lost.
Sort
the
parts and check against
the contents
parts
list.
Carry
out the
assembly steps
in
the order
set
out
in
the instructions.
The
front of the greenhouse
is
the
wall
including the
door, and
the
back
is
the opposite
wall.
After assembly fit the greenhouse to the
base using
connectors
no.
35
and
fit the whole unit
to
a
leveled final
You
may
use
Silicon
lubricant
spray
in
order to help you slide the
profiles
on
the connectors.
Do
not
spray
the Polycarbonate
panels.
Use
the rubber malet
if necessary.
Notes (by steps)
Step
3: Profile
821
should
be
placed on the
left
hand side to be
connected to profile
822.
Profile
821
is
the one with the connector
at
the
end.
Step
4: After connecting profiles
816
to
each
other
clean
the connection
area
using
a
cloth.
Place
the cover strip
on
the conection only
when
it
is
clean and dry. press
the cover strip
from one side
of the connection
to the other
as
mentioned
in
picture
4.
Step
7: Profile 800
& 801
should
be
aligned
and
connected according to the illustration
on page
7
a
&
b.
plug
23
should
be
inserted
to
each
connection while the two
dots
on
the
front of the plug should
be
in
horizontal posi-
tion for
easy assembly.
Step
9:
Use
part
95
as
a
template
in
order to
measure
the
gap
between
posts 800
& 801
of the greenhouse
wall and
roof
area.
Step
10:
Profile 806
should
be placed on
the
right
hand
side.
Profile 805
should be placed on
the left hand
side
when viewed from the front.
Step
11:
Slide
the
panel
7011
till the end
of
the
rail
and insert it
into
it's
final
position
as
shown
in
illustartion
c
.
Step
12:
Profile 808
should
be placed on
the
right.
Profile 807
should
be
placed
on
the
left.
Profile 803
should
be
placed
on
the
left
Profile 804
should
be
placed
on
the right.
Step
15:
Be
careful to assemble
the
window
in
the position
as
shown
on
picture
16
a.
profile
809
should
be placed
while the vent
is
closed to cover any gap.
Ensure
profile
809
is
fitted correctly
as
shown
on
picture
16
b.The
lip on 809
should
face
toward the gutter.
Step
18:
Slide
the
panel
7011
till the end
of the
rail
and insert it
into
it's
final
position
as
shown
in
illustartion
a
and
b.
Step
19:
Step inside
the greenhouse
and
turn
all 23
plugs
a
1/4
of
a
turn clockwise.
Step 20:
Profiles 814
should
be
inserted
from the four corners of the greenhouse,
then insert profile
815
in
between them.
Step 22:
Ensure you use
long screw 450
to secure the door catch
43
as
shown
in
illustration
b.
Step 24:
Bend
the tab lock from the
inside
after
bending the
base parts,
then lock
it
using screw 447.
Step 27:
You
should
tighten
screw
97
when profiles
807
&
808 are
aligned
and
connected.
Tighten
all
screws
when completing
assembly.

Publicidad

loading