ONE-PIECE DOORS
Please read and comply with the warnings and reinforcement
instructions on the previous page.They apply to one-piece doors
also.
• Center the door bracket on the top of the door, in line with the
header bracket as shown. Mark either the left and right, or the
top and bottom holes.
• Meta/Doors: Drill 3/16" pilot holes and fasten the bracket with
the 1/4"-14x5/8" self-threading screws provided.
•
WoodDoors: Drill 5/16" holes and use 5/16"x2" carriage bolts,
lock washers and nuts (not provided) or 5/16"x1-1/2" lag
screws (not provided) depending on your installation needs.
NOTE: Thedoor bracket may be instated on the top edge of the
door if required for your installation. (Refer to the dotted fine
optional placement drawing.)
HARDWARESHOWN
ACTUALSIZE
Self-Threading S crew
1/4"- 14x5/8"
Header Wall
2x4 Support
Door
Bracket
Optional
Placement
of Door
Bracket
Vertical
Centerline of
Garage Door
HORIZONTALAND VERTICAL
REINFORCEMENTIS NEEDED
FORLIGHTWEIGHT GARAGE
BOORS(FIBERGLASS, ALUMINUM,
STEEL, DOORS WITH GLASS
PANEL,ETC.). (NOT PROVIDED)
For a door with no exposed framing,
or for the optional installation, use
lag screws 5/16"x1-1/2" (Not Provided)
to fasten door bracket.
Door
a__ Self-Threading
Screw
'
1/4"-14x5/8"
Top of Door
(Inside Garage)
Optional
Placement
METAL DOOR
_)
Lock
_--
Washer
,
5/16"
i
J
i
,
Top of Door
Garage)
Top Edge
of Door
Optional
Placement
b
arriage Bolt
5/16"x2"
(Not Provided)
WOOD DOOR
24