Descargar Imprimir esta página

GE AHVO5 Manual Del Propietario E Instrucciones De Instalación página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
r_IPREPARING THEWINDOW FOR
INSTALLATION
r_
Measure the width of the window opening and
mark the center line on the inside windowsill.
Center line
@
Install the window lock bracket behind the
inner windowsill,
with the short side of window
lock. Use 2 type B screws provided.
The window
lock bracket helps hold unit
securely in place. Be sure to place window
lock bracket edge flush against back or inner
sill.
Type B screws
Inner sill _
Window lock
brackets
Outer sill,
!_
Center line
Short side
f
D
Remove backing on bottom
seal. Place seal,
adhesive side down, on the bottom of the air
conditioner
behind the bottom
mounting
rail.
3ottom Seal
j43ottom
_
mounting rail
Front
[]INSTALL THEAIR CONDITIONER
IN THEWINDOW
[]
Set the air conditioner
in the window
so that
is centered.
Place the air conditioner
so that
front edge of the bottom
mounting
rail is
against the back edge of the sill.
Top channel-
About 1/4"
Bottom guide
Window lock
bracket
D
Bring the window down so that the front
edge of the top mounting
is in front of the
window.
IVlake sure that that air conditioner
is level or tilting slightly to the outside.
[
L__L L_2II
Type B screws
Extend the curtain panels until they fill the
window.
IVlark the location of the holes in
each corner. Use the drill and 1/8" drill bit
to drill pilot holes. Use 4 type B screws to to
secure the side panels in place.
9

Publicidad

loading