Installation manual – English
3 Garden house assembly
ATTENTION:
➢ The house package also includes 2-3 marked hitting blocks (wall profile approximately 20–30 cm
(8"–12") long). Hitting blocks ARE NOT mentioned in the specification list.
➢ The drawings have the details marked with three-digit position numbers. The exact positions of
those details that have the third digit "x" can be found in the specification list.
Base frame
(Foundation joists)
The base frame of the house must be completely flat and level to ensure that the installation proceeds
without problems.
ATTENTION: different house can have different foundation placements – see the appended base
frame drawing (in Technical specifications)!
Place the treated foundation joists on the prepared foundation in accordance with the drawing at equal
intervals. Make sure that the joists are level and rectangular prior to screwing them together.
ADVICE: It is recommended to place between the foundation joists and foundation a damp-proof course
that will protect the house from moisture and decay.
ADVICE: To ensure protection from wind and storm, it is recommended to attach the foundation joists
to the foundation (for this, you can use for instance metal angles, anchors, etc.). The corresponding
materials are not included in the supplied kit!
Installation of foundation joists: