Descargar Imprimir esta página

Lemeks Palmako PA28-3030 Instrucciones De Montaje, Instalación Y Mantenimiento página 30

Ocultar thumbs Ver también para Palmako PA28-3030:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation manual – English
Door installation:
The doorframe is placed at the formed
aperture and pushed with force onto
the lower log. If it is a double door,
place the leaves on the hinges now.
To open and close the door, fit the
separately packaged lock and handle.
Window installation:
Continue with the installation of the wall logs until you reach the window height. The wall plans (see
Technical specifications) show how many logs go under the window. Install the window similarly with
the door. Just like the door, push the window frame with the window into the window aperture onto the
lower log, applying force. Make sure that the window is not fitted backwards (topsy-turvy).
ADVICE: Definitely make sure that the windows and doors open in the proper direction. The doors
always open from the inside to the outside. The tilt&turn windows open to the inside. The revolving
and the slinging windows open to the outside (the window handles are on the inside).
ATTENTION: It is not necessary to fix the doors and windows to the wall logs! If you wish to do this, it
will be sufficient to fix them with a couple of screws in the lower part of the frame because as they dry,
the wall logs will begin subsiding.
You can conduct the final adjustments of the doors and windows only some 2–3 weeks after the house
installation, when the house will have become adapted to weather conditions and its logs settled.
Roof
Before installing the roof boards, make sure that the house is completely level. Use the water-level to
check all walls.
ATTENTION: When placing the roof, use a stable ladder. Do not step on the roof as the structure is
suitable to sustain only an even load (snow, wind, etc.), and not a point load!

Publicidad

loading

Este manual también es adecuado para:

109013