Descargar Imprimir esta página

Infiniton CMPE-64ABL Manual De Instrucciones página 20

Publicidad

Idiomas disponibles

Idiomas disponibles

Instalación
Español
Installation method 1
Fix the position of the hood in the recess as shown in the figure. The holes in the cabinet must match the
holes in the top of the hood. Insert the screws into the hood according to the relative position of the holes
in the top of the hood. The length of the screws must be sufficient for the following installation to be ca-
rried out correctly.
Hang the hood with the screws inserted in the narrow part of the holes. The screws must be tightened
firmly, making sure that the joint between the hood and its casing is sufficient. Insert the screws into the
safety holes, so that the movement of the hood forwards or backwards is more secure.
Installation method 2
If the installation surface does not suit the installation of the hood, then, according to the figure, fix the
position of the hood on the wall.
Fix two of the supplied screws to the wall, according to the relative position of the 2 fixing holes on the
back of the hood.
The length of the screws must be suitable for the installation below. Also install screws in the safety holes
at the rear of the extractor hood to make it safer to move the extension tray forwards or backwards. The
installation of built-in extractor hoods in wall units is carried out in the same way as in the previous me-
thod.
20
infiniton.es

Publicidad

loading