12
11
02
11
10
09
Assemble steps
1. The front pipe (7) is inserted into the
hole of the front support frame (2) with
the spuare rod (8), and locked with the
cap (10) and the gasket (9). Then the
foam (11) is loaded in turn, and then
placed in the prone position. The
slamming rod (12) > the shrapnel of
the bow should be aligned with the
hole of the front support tube).
13
04
05
14
07 08 08
01
12
11
02
11
10
09
07
08
EN-3
06
03
12
11
10
09
11
12
11
10
09