Descargar Imprimir esta página

Palram Snap & Grow 8'x8'+4' Extension Manual De Instrucciones página 12

Ocultar thumbs Ver también para Snap & Grow 8'x8'+4' Extension:

Publicidad

During Assembly
Make sure
the
base
is
square by measuring
the diagonals and
level by using
a
spirit
level.
You
may
use
silicone lubricant spray
in
order to help you
slide
the panels into the profiles.
Do
not spray the polycarbonate
panels.
Use
a
rubber mallet if
necessary.
MWhen
encountering the information
icon, please refer to the relevant
assembly step for additional comments and
assistance.
6,
Attention
During assembly
use
a
soft surface below the parts to avoid scratches and damages.
M
Steps
Step 4: Profile
848
should
be
placed on the left hand side to
be
connected to profile
849.
Profile 848
is
the one with the connector
at the end.
Step
5:
After connecting profiles
816
to
each
other
clean
the connection
area
using
a
cloth.
Place
the cover strip
on
the connection only when it
is
clean and dry.
Press
the
cover strip from one side
of the connection to the other
as
mentioned
in
picture
4.
Step 8: Profile
835 & 836
should
be
aligned and connected according to the illustration
on page
8
a
&
b.
plug
23
should
be
inserted to
each
connection while the two dots
on
the
front of
the plug should
be in
horizontal position for
easy
assembly.
Step
10:
Use
part
95 as
a
template
in
order to
measure
the gap between
posts
of
the
greenhouse wall and
roof
area.
Step
11: Profile
841
should
be
placed
on
the
right
hand
side. Profile 840
should
be
placed
on
the left hand
side
when viewed from the front.
Step
12: Slide
the panel
566
till the
end
of the
rail
and insert it into
it's
final position
as
shown
in
illustration
c
.
Step
19:
Be
careful
to
assemble the
window
in
the position
as
shown on picture
20
a.
profile
809
should
be
placed
while the vent
is
closed
to
cover any gap. Ensure
profile
809
is
fitted
correctly
as
shown on picture
20
b.The lip on 809 should
face
toward the gutter.
Step 22, 23:
If
the
window
doesn't
close
properly,
please release
the
screws,
adjust the
profile and re-tighten the
screws.
Step 25:
Slide
the panel
566
till
the end
of the
rail
and insert it into
it's
final
position
as
shown
in
illustartion
a
and
b.
Step 26:
Step inside the greenhouse and
turn
all 23
plugs
a
1/4
of
a
turn
clockwise.
Step 27:
Profiles 814
should
be
inserted from the four corners
of
the greenhouse,
then insert profile
815 in
between them.
Step 28:
Ensure
you
use
long screw 450 to
secure
the door
catch
363
as
shown
in
illustration
b.
* Please
tighten
all
screws
when completing assembly.
Screws
411
and nuts 466
are used
throughout the
assembly
process.
Screws
411
are
to
be
assembled from the outside and nuts
466
from the inside of the
greenhouse.
If
not specified otherwise, do not fasten
screws
and nuts
(411 &
466)
for more
than
2-
3
turns.
Do
not tighten them until completion of the panels' assembly.
These
2
icons
indicate if
screw's
tightening
is
required or not.
However,
in
some
steps,
temporary tightening of
a
few
screws may be
needed
to
prevent
a
profile from sliding out.
Note:
Firmly connect the product to
a
level surface
immediately after completion of the
assembly.
Anchoring this product to the ground
is
essential to
its
stability
and rigidity.
It
is
required
to complete this
stage
in
order for your warranty to
be
valid.

Publicidad

loading