5
5
5.1. Insert the wall track cover (K) to the wall track (A2) on the door side.
5.2. Insert the door bottom seal strip (P) onto the door panel (C).
5.3. Install the door vertical seal strip (J) on the closing end. For the door vertical seal strips, they should start right above the
door bottom seal strip (P).
5.1
K
A1
B
M
RIGHT DOOR OPENING
FIXED PANEL AND SUPPORT BAR INSTALLATION
INSTALLATION DU CADRE
INSTALACIÓN DE MARCOS
A2
C
A2
K
FRAME INSTALLATION
5.2
C
P
WARNING!
Before continuing,
place the door panel
(C) inside the shower
enclosure to facilitate
future steps!
C
P
C
A1
K
M
LEFT DOOR OPENING
5.3
J
J
A2
B
PAGE 16