ASSEMBLY INSTRUCTIONS
12
Hardware Used
EE
AI
K2
K2
EE
12. Fix the top beam (Q1/Q2) to the slant beams (K1/K2) with screw (EE).
Note: Be sure measurements diagonally across the overall frame are within 5 mm of the same
distance after completing this step.
x8
Q1
K1
C1
C2
EE
EE
Q1
Q2
Note: When Install the top beams (Q1&Q2),
be sure them are flush with the tops of the
slant beams (K1&K2).
x1
Q2
K1
B1
Equal diagonal
distance
K1
K2
EE
21
K2
B2
K1
EE
Q2
Q1