Descargar Imprimir esta página

Shindaiwa PT262S Manual De Instrucciones página 19

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Observe the following precautions when checking and maintaining your product after use:
 Turn the engine off and do not attempt to check or maintain the product until the engine has cooled.
You could burn yourself.
 Remove the spark plug cap before performing checks and maintenance.
An accident could occur if the product starts unexpectedly.
 Checking and maintenance requires specialist knowledge. If you are unable to check and maintain the product or deal with a
fault yourself, consult your dealer. Do not attempt to dismantle the product.
 For spare parts and consumables, please use only genuine parts and designated products and components. Using parts from
other manufacturers or non-designated components may result in a malfunction.
Servicing guidelines
Area
Air Filter
Choke Shutter
Fuel Filter
Fuel System
Spark Plug
Carburettor
Cooling System
Muffler Spark Arrestor
Flexible shaft
Guide Bar / Sprocket Nose Inspect/Clean/Lubricate
Saw Chain
Recoil Starter Rope
Screws/Nuts/Bolts
Maintenance procedure letter codes: I= Inspect, R= Replace, C= Clean
(1) Apply good quality lithium grease every 25 hours of use.
* All recommendations to replace are based on the finding of damage or wear during inspection.
 Time intervals are maximum. Actual use and your experience will determine the frequency of required maintenance.
Maintenance and care
If you have any questions or problems, please contact your dealer.
IMPORTANT
Maintenance
Inspect/Clean
Inspect/Clean
Inspect/Replace
Inspect/Replace
Inspect/Clean/Replace
Adjust/Replace and adjust
Inspect/Clean
Inspect/Clean/Replace
Inspect/Grease
Inspect/Sharpen/Replace/
Tension
Inspect/Clean
Inspect/Tighten/Replace
IMPORTANT
Maintenance and care
Maintenance and care
WARNING
Page
Daily or be-
fore use
18
I / C *
-
I / C
18
18
I *
20
18
19
I / C
19
20
21
I / C *
10/21
I *
-
I / C *
-
I *
17
Every refuel 3 months or
90 hours
R *
I *
I*
I/C/R *
I/R
I/C/R *
I(1)
I
I *
Yearly 600
hours
I / R *

Publicidad

loading