Installing the unit
5.
Bolt the two side fastenings, applying a torque of 2 Nm.
6.
Check that the unit properly secured.
Once the unit has been installed correctly, the connection process will begin.
Connect in the following order:
1.
External ground protection connection.
2.
Communications connection.
3.
AC connection.
4.
DC connection.
CAUTION
It is mandatory to follow the order described above. Do not supply power until all the connections have been
completed.
ACL2012IQM01_ - Installation and Operation Manual
Ingeteam
EN
ES
FR
IT
PT
25