Descargar Imprimir esta página

Glacier bay HDQFP1B4202CP Instrucciones De Instalación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

Operation
1
Checking for leaks
Ensure the handle is in the off position. Turn the
hot and cold water supplies on and check all
connections for leaks. If leaks are discovered,
check the connections to ensure they are tight and
properly secured.
Detach the spray head (A) from the pull-down
spray hose (H). Hold the pull-down spray water
supply line (H) firm to prevent it from retracting
into the faucet body (B).
Lift the handle to allow the water to run for
approximately one minute. This flushes away any
debris that could damage the internal parts.
Turn the water off and reattach the spray head (A).
A
7
Please contact 1-855-HD-GLACIER for further assistance.
HOMEDEPOT.COM/GLACIERBAY

Publicidad

loading