actioN oN REcEipt
1
Check the packing case for damages. In case you suspect any refrigerator damages, notify your supplier
before unpacking.
2
Unpack the refrigerator carefully.
3
Check the refrigerator. If it is damaged, notify your supplier.
4
Check that the flue baffle is hanging inside the chimney .
5
Read the operating instructions and follow them exactly.
!
Make sure that the correct burner jet for the gas available (propane
or butane) is fitted. It may be necessary to change size of burner jet.
iNStallatioN
1
Place the refrigerator in the coldest possible place
inside a building. The refrigerator is tested to operate
reliably in temperatures up to 43°C.
2
The room must be ventilated and free air circulation
around the refrigerator is necessary.
Keep the refrigerator in the shade and away from
3
heat of any kind.
4
Avoid draughts, such as door and window openings.
Clearances to wall must be at least 25 mm and to
5
roof at least 100 mm.
6
Check that the door seals properly against the
cabinet.
7
Ask for the local gas suppliers advice as to what
material to use for gas connections.
8
If electricity is used, check that the voltage is correct.
If possible, let an authorized technician make the
gas installation.
!
A gas regulator must be fitted to the gas bottle.
www.sibir.com
5
25 mm
3
100 mm
copyright © sibir international