All wiring must be performed by a professional person.
Connec�ng the ba�ery with a suitable cable is important for safe and efficient
opera�on of the system. To reduce the risk of injury, refer to Chart 3-2 for
recommended cables.
Please follow below steps to implement ba�ery connec�on:
1. Please choose a suitable ba�ery cable with correct connector which can well fit into the
ba�ery terminals.
2. Use a suitable screwdriver to unscrew the bolts and fit the ba�ery connectors in, then
fasten the bolt by the screwdriver, make sure the bolts are �ghtened with torque of
24.5 N.M in clockwise direc�on.
3. Make sure polarity at both the ba�ery and inverter is correctly connected.
4. In case of children touch or insects go into the inverter, Please make sure the inverter
connector is fasten to waterproof posi�on by twist it clockwise.
Installa�on must be performed with care.
Before making the final DC connec�on or closing DC breaker/disconnect, be sure
posi�ve(+) must be connect to posi�ve(+) and nega�ve(-) must be connected to
nega�ve(-). Reverse polarity connec�on on ba�ery will damage the inverter.
For 5-12kW model, ba�ery connector screw size: M10
15.3/16mm
DC Ba�ery Input
- 09 -
29.54mm
2/1AWG Wire Size