6. Startup and Shutdown
that the two inputs be connected to the same number of photovoltaic modules.
6.1 Start up the inverter
When start up the three phase string inverter, should fellow below steps:
1. First switch on the AC breaker.
3. When the ac voltage and DC voltage are normal, the inverter start-up is readyto begin.
crystal will show that the inverter is self-checking.
4. If the parameter is within acceptable range, the inverter will generate energy.
NORMAL indicator light is on.
6.2 Inverter Shutdown
connector. The inverter will close the LCD and all LED within two minutes.