Scope Of Delivery - Derungs Dmed Triango 100 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 83
3

SCOPE OF DELIVERY

3.1
TRIANGO 100 C
included with delivery:
1 luminaire head with sterilizable handgrip
1 ceiling arm
1 ceiling conduit
1 ceiling bracket
1 ceiling cover
1 end ring
3.2
TRIANGO 100 W
included with delivery:
1 luminaire head with sterilizable handgrip
1 arm for wall-mounting
1 wall-mounted joint
1 wall bracket
1 wall cover
1 end ring
ENG
25

Publicidad

Tabla de contenido
loading

Tabla de contenido