ASSEMBLY
14.1
Preparation
Check delivery content
Check the delivery immediately for transport damage and missing parts. Report any damage or
missing parts to your dealer or the shipping company immediately. Visible transport damage must
also be noted immediately on the delivery note in accordance with the provisions of the warranty,
otherwise the goods are deemed to have been properly accepted.
Requirements for the installation site
The chosen installation site must have a suitable connection to the power supply and a connection
to a dust collection system. Observe the safety requirements and the dimensions of the machine.
Place the machine on a level, solid surface that can support the weight of the machine. The chosen
installation site of the machine must comply with the local safety regulations as well as the
ergonomic requirements for a workplace with sufficient lighting conditions.
The floor at the installation site must be able to bear the load of the machine!
When dimensioning the required space, take into account that the operation, maintenance and
repair of the machine must be possible without restrictions at all times. Also take into account the
working areas of neighbouring machines.
The base of the machine has fixing holes by means of which the machine is firmly connected to
the floor. This improves the stability of the machine.
A
mm
4910
HOLZMANN Maschinen GmbH
A: Transporting points for forklift
B
C
6565
1350
www.holzmann-maschinen.at
N O TE
D
E
3060
2220
ASSEMBLY
F
G
3200
890
FKS305V32TOP_400V
H
1120