X i D
1 9
Keep Working
Charging the Battery
Caution!
Always pull out the plug before you remove the battery pack from or connect the battery pack to the charger.
Never charge the battery pack when the ambient temperature is below 10C° or above 40C°.
1. Be sure to place the tool on a clean dry surface within 2 meter of a AC 220-240V, 50Hz
wall receptacle.
2. Connect the plug of charger to main socket, the LED light (pic. A) turns green.
3. Insert the battery pack to charger, the LED light turns red.
4. After about 1-hour charging, the LED light turns to green, that means the battery pack are charged fully.
5. Disconnect the unit after charging as the unit should be ready for use
Operation instructions
Inserting drill bits / screwdriver bits
To insert a drill bit / screwdriver bit, rotate the chuck collar anti-clockwise to open the chuck.
Insert the drill bit, making sure it is centered in the chuck.
For screwdriver bits use an extension holder. Select the correct screwdriver bit to avoid damaging the screw.
Tighten the chuck by turning clockwise. Pull on the bit to ensure it is firmly secured.
KEEP WORKiNG
04